CALCULATING THE AMOUNT OF AVAILABLE POWER

 

A simple formula for approximating electric power production at a hydroelectric plant is: P = ρhrgk, where P is Power in watts, ρ is the density of water (~1000 kg/m3), h is height in meters, r is flow rate in cubic meters per second, g is acceleration due to gravity of 9.8 m/s2, and k is a coefficient of efficiency ranging from 0 to 1. Efficiency is often higher (that is, closer to 1) with larger and more modern turbines.

Annual electric energy production depends on the available water supply. In some installations the water flow rate can vary by a factor of 10:1 over the course of a year.

 The catchment area upriver of the Tarbela Dam is spread over 168,000 square kilometers (65,000 sq mi) of land largely supplemented by snow and glacier melt from the southern slopes of the Himalayas. There are a number of main Indus River tributaries upstream of the Tarbela Dam. These are the Shyok River, joining near Skardu, , Hunza&Gilgit near Danyur, Astore near Bunji and the Siran River near Tarbela. Discharge for Arabian Sea – average 6,600 m3/s (230,000 cu ft/s) approx.

http://www.waterinfo.net.pk/pwss/vol1main.htm

While calculating the potential for Gilgit and Baltistan, the coefficients in the above equation are as follows:

 H= 1500m – 610m (4971ft) – (2001ft) =880m (2970 ft)

R=6,600 m3/s (230,000 cu ft/s)

G=9.8 m/s2

K=0.8

Therefore

 P=ρhrgk=1000*880*6,600*9.8*0.8=45534720000Watt=45,534.72 Mega Watt

Even if 50% of this potential is harnessed then it not only meets the energy Needs of Pakistan but would be available for export to other countries.

Similarly if the potential in Chitral/Swat/Kaghan/AJK and other river sources is added to this potential on the Indus alone, you can gauge the prospects for the entire country.

Implications: If only 10,000 MW is harnessed, it will generate daily revenue of RS 240 Billion even if it is sold at a paltry rate of Rs1.0 per unit. Remember the current energy in Pakistan is billed at Rs 8.00 per unit. This volume of revenue will not only be sufficient to pay the loans/interest but it will also generate thousands of jobs for the coming generation, besides making the region envy of the world.

 Message to the leadership in Pakistan: “Please heed to this rather than your coffers”.

Brig Hisamullah Beg SI(M)

Baltit, Hunza

I am seeking the Government in Gilgit and Baltistan to make a policy decision; meanwhile I have mailed quarries to agencies such as Kuwait Fund, ADB, World Bank. This can have a meaning only if the Government of GB modifies present policy of allowing “Private Investment with Community involvement limited to 2-Mega Watt and below”. Furthermore In view of the inefficient and corrupt set up of the government (small contractors tell me that they have to pay Rs 500/00 for the file to move from one desk to the other; military monitoring team says it is filth whatever you check) it will only be possible to harness this potential through a strong “CIVIL SOCIETY”

Hydroelectric Potential at Ataabad Site:

(Considering the Average Winter Flow)

 

 H=55.0 m

R=95 cum/sec (Minimum Winter Flow)

G=9.8 m/sec/sec

K=0.8

ρ ~1000 kg/m3

Power=ρhrgk =1000*55*95*9.8*0.8 = 40964000 Watts=40.96 MW

Posted by Hisamullah Beg SI(M) at 9:10 AM

Advertisements

One thought on “CALCULATING THE AMOUNT OF AVAILABLE POWER

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s